Рекомендую фрилансера.
Volodimir Sokolov
Winning proposal- Projects 50
- Rating -
- Rating 378
Budget: 600 UAH Deadline: 3 days
KP2 Precedent Diagram 100 UAH (Visio or RR)
KP3 ERD (as in the method) 100 UAH (Visio or RR)
CP4 Physical data model 100 UAH, Logical data model 50 UAH (all in ERwin or Visio)
CP5 Diagram of Classes 100 UAH (Visio or RR)
CP6 Activity Diagram 100 UAH, Continuity Diagram 100 UAH, Status Diagram 100 UAH (all in Visio or RR)
Together 600, payment of 20 UAH, 80 UAH after photo diagram gradually
I will submit diagrams to Visio/RR/Erwin files (optional) + MS word to A4 (no or to your taste)
to each diagram up to 1 page description what and how and why so
I have experience in creating diagrams, I see reviews, I can download samples according to need.
Proposals concealed
Proposals are currently absent
-
Volodimir Sokolov 8 December 2016Можу створити діаграми UML та БД, але не в visual studio, а в MS Visio/Rational Rose та Erwin
Current freelance projects in the category C#
Configuration: 1C UT 11 Address warehouse Zebra TC26 TSD Work via RDP Product scanning is performed in receiving, placement, picking documents, and other warehouse operations. Current problem: Warehouse workers operate through the Zebra TSD. When scanning, they do not always notice messages on the screen. It is necessary to implement different sound signals for different scanning results. Required functionality: Successful scanning and processing in 1C short sound signal. Barcode read by the scanner, but the product is not found in 1C another sound signal (different from successful). Error during warehouse operation incorrect cell; incorrect product; other address warehouse control errors. separate sound signal. Sounds should be played on the TSD via RDP. Preferences: use of WAV files or another reliable playback method; ability to add new types of sound messages in the future; minimal impact on the speed of TSD operation. Please specify in your response: Experience with UT 11 and address warehouses. Have you implemented similar tasks for Zebra TSD or other TSDs. Estimated cost and execution time. How the implementation of sound signals is planned.