• Projects -
  • Rating -
  • Rating 178

Budget: 2500 UAH Deadline: 3 days

Good morning! Please send the screenshots of the errors in private messages so we can sort everything out in detail. Regarding your situation with Interaction Server 23 and 1C 8.3.24, the following can be said preliminarily: Version mismatch: The error "Version does not match" usually occurs if the version of the extension module (1C server component) differs from the version of the Interaction Server (Collaboration System Server). For 1C 8.3.24, it is recommended to use the current versions of the Interaction Server (the 23rd branch is suitable, but check the specific build). Network error without a certificate: If a network error occurs during a working telnet when SSL is disabled, it often means that the Interaction Server continues to expect an encrypted connection (HTTPS/WSS), or the settings of the 1C cluster still have the protocol wss:// instead of ws://. Ports: Check that not only the main ports are open but also the port for gRPC (default 9094), if it is used in your configuration. I am waiting for the screenshots, and we will fix it!

Proposals concealed

The list does not show proposals concealed by the client or freelancer with a Plus profile, as well as proposals violating rules

Current freelance projects in the category Enterprise Resource Planning (ERP)

6 July
4 July
3 July
1 July
1 July