Andrey Medvedev
Winning proposal- Projects 18
- Rating -
- Rating 179
Budget: 1000 UAH Deadline: 2 days
Good day .
I work in Solida. Ready to implement your project.
Write it.
with respect,
Andrei
Budget: 600 UAH Deadline: 2 days
Hello to you. Ready to perform. Examples of work can be found in my profile.
Budget: 1000 UAH Deadline: 3 days
Good day . Ready to fulfill your order. Experience in solidworks for over 15 years. My work: https://www.instagram.com/3d_mechanics_kpk/
Budget: 1000 UAH Deadline: 2 days
Hello to you.
Ready to perform your work.
Experience in drawing and 3D models over 12 years.
I work at SolidWorks and Compass.
HTTPS://sketchfab.com/projectsA1/models
Look at my portfolio and reviews.
thank you
Budget: 1000 UAH Deadline: 2 days
Ready to perform. The price is indicated for the creation of 3D models by drawings. Experience in SolidWorks is 8 years. Examples of work in SolidWorks are in the portfolio.
Budget: 1000 UAH Deadline: 2 days
Welcome to! I have been my work program since 2000. Examples in the portfolio
Budget: 1000 UAH Deadline: 1 day
Andrei Good Morning.
I want to execute your project. I work as an engineer-constructor at a liver factory, I have experience working with models, liver-off equipment.
I can help with the preparation of shapes.
I can download the photos of the models and the finished flowers. (The price and time can be discussed)
Budget: 700 UAH Deadline: 2 days
Experience in Solid Works 12 years. Examples of portfolio.
Budget: 1000 UAH Deadline: 2 days
Required for this drawing (the drawing in greater permission will be provided.) Create 3D component models and assembly in the SolidWorks program.
Proposals concealed
Proposals are currently absent
Current freelance projects in the category Object Design
It is necessary to design solar stations on a permanent basis - both large and small. Layout of panels, calculation of generation in PV syst, selection of main and electrical equipment (this is preferable).
It is necessary to design a cabinet with two drawers for the bathroom. White color. The drawers should have soft-close mechanisms. We will assemble it ourselves. The cabinet stands on legs.
Develop for two devices: general assembly drawing of the metal frame; general assembly drawing of the service platforms; detailed drawings of ladders; detailed drawings of railings; detailed drawings of equipment supports; specification of metal products; St3 or 09g2s As a result of the design, it is necessary to obtain: 3D model of the frame. General assembly drawing. Specification of metal products. Calculation of the load-bearing capacity of the structure (will be a plus). Description of the device:ParameterValueType of deviceVertical reactor with a stirrerWorking volume2.0 m³Total volumeabout 2.36 m³Body diameterabout 1500 mmHeight of the deviceabout 4265 mmBody materialSteel with enamel coatingType of stirrerAnchorStirrer rotation frequencyabout 85 rpmHeat carrierThermal oil
Development of a mechanism for alternating the flipping of plastic cupsProject Goal It is necessary to develop only the mechanism for flipping plastic cups "every other one" for an automatic production line. The device must ensure the following sequence: 1st cup — without flipping (0°) 2nd cup — flip 180° 3rd — without flipping 4th — flip 180° and so on. As a result, the output should produce the sequence: 0° → 180° → 0° → 180° → ...What is already available The cups move along the conveyor in a single row. Before the mechanism, all cups have the same orientation (lid up). Only the flipping unit needs to be developed.Proposed Operating Principle The following scheme is considered: A dividing screw synchronizes the flow of cups. All cups gradually rotate to the position of 90°. Then, the cam mechanism acts only on every second cup. Every second cup returns from the position of 90° back to 0°. The others continue rotating to 180°. As a result, we get: 0° 180° 0° 180° If the performer offers a simpler, more reliable, or more technological solution — we are ready to consider it.Requirements1. Develop a complete 3D model in SolidWorks It is necessary to model: dividing screw; flipping mechanism; cams; guides; shafts; mountings; all necessary parts.2. Perform kinematic verification It is necessary to ensure that: the mechanism operates without jamming; there are no intersections of parts; the cups are flipped correctly; the mechanism is suitable for manufacturing.3. Conduct Simulation / Motion Study It is necessary to perform an animation of the mechanism's operation in SolidWorks Motion. It should be visible: the movement of the cups; the rotation of parts; the sequence of flipping every second cup.Work Result The performer must provide: source files SolidWorks (*.SLDPRT, *.SLDASM); assembly; Motion Study; animation video; STEP file of the assembly; drawings of the main parts.
It is necessary to make an analysis of the project (drawing) of the advertising installation with a description. Dimensions: Width: up to 2.25 m Height: up to 2 m Depth: up to 1 m