Switch to English?
Yes
Переключитись на українську?
Так
Переключиться на русскую?
Да
Przełączyć się na polską?
Tak
Post your project for free and start receiving proposals from freelancers within minutes after publication!

Stations for the Beer

Translated2226 USD

  1. 188  
    150 days2226 USD

    Good day . Ready to consider your offer, with a full cycle from the development of the project to the finished equipment, staff training, and a year-long warranty. As for the price and time of manufacture, it is necessary to discuss more in detail all the moments of manufacture, materials, components and other similar things. We look forward to your feedback for further discussions.

  2. 110  
    100 days2226 USD

    Welcome to! Ready to review your project. I have evidence in the design and manufactured dosing apparatus (full cycle). There is great experience in the development and manufacture of weights of different types. Given the fact that the technical task needs to be clarified, the price and deadlines are approximate.

  3. 554    16  0   1
    30 days2226 USD

    Good Morning Andrei. Interesting task. I can help you both with the design and the manufacture of this verstat. However, I can’t take the cost and time of all the works and ask them in advance. Therefore, I can propose to break the project at the stage: conceptual, quotation, development of work documentation and indirect manufacturing of the list. At the quotation stage you will clearly be able to obtain the deadlines and cost of the development and manufacture of the object. On the other hand, I guarantee the transparency and objectivity of the project at each of its stages, directly prepared working equipment, further technical support and training of the staff if necessary. So if you are interested in this offer, please contact me.

  4. 246    1  0
    150 days2226 USD

    Good Morning Andrew! There is experience in the design and manufacturing of venture equipment and non-standard equipment. I can offer solutions and, if necessary, prepare equipment.
    Congratulations to Alexis!

  5. 121  
    150 days2226 USD

    Good day . We have experience in designing and manufacturing unique equipment.
    The KD is about 21 days. Preparation and preparation will take 6 months.
    If the time is normally, I will give it to the calculation.

    1 proposal concealed
    1 proposal concealed
  • Vitalii L.
    5 October 2022, 14:39 |

    Такой формат проекта подходит для теоретической части, когда речь идет про изготовление - вкладывать свои в закупку комплектующих в надежде в конце получить всю сумму - не практично. Хотя, судя по ставкам есть люди, которых это устраивает))

Current freelance projects in the category Drawings & Diagrams

Make changes to the external technical drawings

Good day, we need to make adjustments to the external technical drawings. Please state the price, completion time, and when you can start. Technical specifications - We would like the roof to be flat slightly above the eaves level (photo attached). - The front dormer window is…

Drawings & Diagrams ∙ 2 minutes back

Development of the KM section of the warehouse with an administrative part

It is necessary to develop the KM section of this project. The building is a warehouse with an administrative part, a metal frame, and sandwich panel cladding. The height is 5m to the lower chord of the truss.

Architectural DesignDrawings & Diagrams ∙ 2 hours 31 minutes back ∙ 2 proposals

Design project of a one-room apartment

1. General information: 1-room apartment in a new building Area: 40 m² Condition: rough finish (there is screed, plastering, electrical work) City: Uzhhorod, West Towers residential complex Remote approval Implementation: through a foreman / construction team 2. Project goal…

Architectural DesignDrawings & Diagrams ∙ 5 hours 24 minutes back ∙ 10 proposals

Table support

16 USD

You need to create a project for a table support in AutoCAD and, accordingly, the drawings for it. The project itself is quite simple. The most complicated part is to create just one detail which is the base of the support. Later, you will need to copy it and mirror it in…

Drawings & DiagramsObject Design ∙ 19 hours 41 minutes back ∙ 10 proposals

Development of CAD diagrams for engineering networks of the warehouse and production complex (water supply/sewerage, p

334 USD

Context and Purpose. We are implementing a warehouse-production complex (basement level, L-shaped room ~63×44.6 m, usable area ~2,330 m², 11 functional zones: reception, storage of GP and raw materials, production areas, cutting, assembly, unloading, showrooms, office, auxiliary…

EngineeringDrawings & Diagrams ∙ 21 hours 19 minutes back ∙ 2 proposals

Client
Project published
3 years back
177 views