Budget: 1500 UAH Deadline: 1 day
Good day ! I have experience in building a database in Excel. I can start today.
Budget: 1500 UAH Deadline: 1 day
Good day ! I have experience in building a database in Excel. I can start today.
Budget: 1500 UAH Deadline: 1 day
Hello to you. Ready to perform the task. I will be happy to cooperate. turn to
Budget: 1500 UAH Deadline: 1 day
Good day . I will be glad to help. I do everything quickly and efficiently!
Budget: 2500 UAH Deadline: 3 days
I wrote a project, similar to yours - for the dance school.
Form form for all groups with distribution by teachers. Formation of groups. Journals: release of missions, registration of visits. Bases are general and “black list”. Form of filtering: by groups (direct), by months.
If you are interested, write, let’s talk.
Possible formatting documents (revisions, faults...) with storage in the Excel file. Word and PDF
Budget: 1500 UAH Deadline: 3 days
I will consider the possibility of creating such a table in Excel after discussion.
Budget: 1500 UAH Deadline: 1 day
A little bit not your own.
But I did a calendar of jobs, payments, etc. for the repatriates.
https://calendartestwebapp.pythonanywhere.com/
Look, maybe you’re going.
Budget: 1500 UAH Deadline: 1 day
Good afternoon, I was interested in your order. I have Excel and Google tables. I can help you, please write, I'm glad to work with you.
It is necessary to design solar stations on a permanent basis - both large and small. Layout of panels, calculation of generation in PV syst, selection of main and electrical equipment (this is preferable).
It is necessary to design a cabinet with two drawers for the bathroom. White color. The drawers should have soft-close mechanisms. We will assemble it ourselves. The cabinet stands on legs.
Develop for two devices: general assembly drawing of the metal frame; general assembly drawing of the service platforms; detailed drawings of ladders; detailed drawings of railings; detailed drawings of equipment supports; specification of metal products; St3 or 09g2s As a result of the design, it is necessary to obtain: 3D model of the frame. General assembly drawing. Specification of metal products. Calculation of the load-bearing capacity of the structure (will be a plus). Description of the device:ParameterValueType of deviceVertical reactor with a stirrerWorking volume2.0 m³Total volumeabout 2.36 m³Body diameterabout 1500 mmHeight of the deviceabout 4265 mmBody materialSteel with enamel coatingType of stirrerAnchorStirrer rotation frequencyabout 85 rpmHeat carrierThermal oil
Development of a mechanism for alternating the flipping of plastic cupsProject Goal It is necessary to develop only the mechanism for flipping plastic cups "every other one" for an automatic production line. The device must ensure the following sequence: 1st cup — without flipping (0°) 2nd cup — flip 180° 3rd — without flipping 4th — flip 180° and so on. As a result, the output should produce the sequence: 0° → 180° → 0° → 180° → ...What is already available The cups move along the conveyor in a single row. Before the mechanism, all cups have the same orientation (lid up). Only the flipping unit needs to be developed.Proposed Operating Principle The following scheme is considered: A dividing screw synchronizes the flow of cups. All cups gradually rotate to the position of 90°. Then, the cam mechanism acts only on every second cup. Every second cup returns from the position of 90° back to 0°. The others continue rotating to 180°. As a result, we get: 0° 180° 0° 180° If the performer offers a simpler, more reliable, or more technological solution — we are ready to consider it.Requirements1. Develop a complete 3D model in SolidWorks It is necessary to model: dividing screw; flipping mechanism; cams; guides; shafts; mountings; all necessary parts.2. Perform kinematic verification It is necessary to ensure that: the mechanism operates without jamming; there are no intersections of parts; the cups are flipped correctly; the mechanism is suitable for manufacturing.3. Conduct Simulation / Motion Study It is necessary to perform an animation of the mechanism's operation in SolidWorks Motion. It should be visible: the movement of the cups; the rotation of parts; the sequence of flipping every second cup.Work Result The performer must provide: source files SolidWorks (*.SLDPRT, *.SLDASM); assembly; Motion Study; animation video; STEP file of the assembly; drawings of the main parts.