Budget: 7000 UAH Deadline: 14 days
Good day, I can complete your project, 15 years of experience, write to discuss the details.
Currently, there is very little data about the object. The file includes the master plan of the first construction phase and some pages from the project presentation.
The project should include:
- Cable networks to each building
- Lighting along the access roads (?)
- Installation of metering units in the buildings
- Charging stations for electric vehicles
- Other points based on your experience.
At this stage, it is necessary to determine the approximate cost of design work and the timeline for completion.
Budget: 7000 UAH Deadline: 14 days
Good day, I can complete your project, 15 years of experience, write to discuss the details.
Budget: 25000 UAH Deadline: 20 days
Good day!
An electrical engineer with project development experience:
- internal/external power supply;
- internal/external lighting;
- lightning protection and grounding systems.
Based on the information you provided, the preliminary cost of design work for designing external lighting systems and external power supply from the 0.4 kV bus of the transformer substation to consumers can be from 25,000 hryvnias. If there is a need to visit the site for design, travel expenses are paid separately.
The estimated project completion time is from 4 weeks and depends on many factors, primarily the quality of the technical assignment (TA), completeness of initial information for design, presence of changes to the TA during the design process, etc.
The final cost of design work and completion deadlines can be discussed after approval of the technical assignment and formation of the design task.
I have a certificate as a design engineer for objects of class consequences (responsibility) CC1 (minor consequences).
Please note that the above conditions are valid for a project carried out without the official stamp of the chief engineer (GIP). Issues related to approved design documentation with the official GIP stamp are discussed separately.
The minimum project composition, according to DBN A 2.2-3-2014, Appendix D:
1. Explanatory note;
2. Main drawings:
- plans of external engineering networks and communications and/or plans of internal site networks and structures to them;
- schematic diagrams of engineering equipment installation, fundamental solutions for energy-saving measures;
- technological layouts with placement plans (location) of main equipment;
- electrical connection (connection) diagrams;
- other diagrams necessary for installation work;
3. Equipment, products, and materials specifications;
4. Survey sheets and dimensional drawings for relevant types of equipment and products.
Optimal technical solutions will be offered according to the requirements of standards and rules, in accordance with the technical assignment (design task) and your wishes, within a reasonable timeframe and at an affordable price!
If you are interested in the proposal – I am ready to discuss the details.
Budget: 3000 UAH Deadline: 15 days
Good afternoon. I am an energy specialist by education. There is not enough input data for accurate calculations, but the data that is missing can be replaced with more common ones for such buildings. The result will be an approximate price that can be used as a reference for expenses.
Budget: 700 UAH Deadline: 20 days
Good day, ready to cooperate under Your certificate.
To assess the scope, please send the complete original data for design.
The price and deadline are indicated in advance for contact.
# Requirements Specification — USB-C PD → 4× USB-C 5V Power Distribution Board for 5G Modem Sled Purpose and Scope A single PCB that receives power from a single consumer USB-C PD power bank with a capacity of 100–200 W and distributes stabilized 5 V through up to four USB-C ports solely for power. Each port powers the auxiliary power input of one M.2 Key-B (NGFF) modem sled with an installed 5G module Quectel RM520N-GL or RM505Q. The board provides only power — USB data connections of the modems with the host pass through the sled's own USB connectors and are not included in the scope of this specification. I am not familiar with typical budgets for such projects, so please propose your budget.
I need to create a coffee island project as quickly and clearly as possible so that it can be handed over to specialists for construction. Before starting, we need to talk somewhere on Discord or just via video call so that I can provide as much information as possible. Priority will be given to candidates who know the specifics of this business/have already done something similar to my request. Have a great day, Olexiy.
A drawing of a double-pitched truss with parallel chords made of profile pipe is needed. Detailing of the corner cuts of the blanks is required.
It is necessary to draw all floors and facades according to the old drawings in Dwg. Upon completion of the work, the rvt and dwg files.balcony 2010.pdfbalcony 2010_2.pdfnew house.pdf
it is necessary to design and prepare drawings of the workspace (workbench, wall, and shelf). sheet metal 1.5 mm prepare files for laser cutting prepare drawings for bending there are also additional projects