Switch to English?
Yes
Переключитись на українську?
Так
Переключиться на русскую?
Да
Przełączyć się na polską?
Tak
I offer comprehensive development of modular houses with complete structural processing, where each element is not only represented in the drawing but also logically justified in terms of manufacturing, transportation, and assembly.

The project is executed at a level suitable directly for production and assembly, taking into account real technological processes, connection nodes, and material behavior under load.

The work includes a detailed calculation of the structural part with in-depth processing of nodes, joints, and load-bearing elements. A clear manufacturing logic is formed — from cutting the material to the sequence of assembling the module, its securing, transportation, and installation on site.

Each solution is based on an engineering approach, considering spatial rigidity, wind and operational loads, as well as the specifics of real assembly.

Upon request, it is possible to form a detailed specification of materials with precision down to each element, including consumables, fasteners, and auxiliary items. Separate calculations are also performed for specific client points — local nodes, reinforcements, non-standard solutions, or optimization of the structure.

The result is not just a visualization or drawing, but a holistic, technically verified system that allows for production to proceed without additional clarifications and time losses.

I work with ArchiCAD, with a deep understanding of metal, wooden, and combined structures, ensuring accuracy, logic, and realism in every project.

#modularhouse #design #ArchiCAD #structure #detailing #drawing #calculation #construction #framehouses #metalstructures #woodenstructures #engineering #architecture #specification #nodes #assembly #manufacturing #BIM #Freelancehunt #projectconnection
Work details
Budget 1014 USD
Added 29 April
81 views
Freelancer
Serhii Petelguzov
Ukraine Kharkiv  11  0

A little busy A little busy
11 Safes completed
1 arbitration
On the service 7 months 3 days