Integration of 1C and Prom
There is a problem with the loading of goods from 1c to 1m.
Indicators are not complete in a number of positions.
Not all positions in the presence are drawn out on the prom (there are differences in the remains between the prom and 1c)
In fact, it is necessary that the correct remains were drawn from 1c and everything did not drawn extra.
The work of the prom.
Because the problem can be both in 1c and in medium.
Нужен человек с опытом интеграции 1с и прома.
Работы самого прома.
Так как проблема может быть как в 1с так и в проме
Current freelance projects in the category System & Network Administration
Setting up a monthly subscription for a Telegram channel/group
17 USD
It is necessary to set up an automatic monthly paid subscription for my Telegram channel (or group) with payment acceptance exclusively in Ukrainian hryvnias (UAH). Integration with payment systems (priority: LiqPay, WayForPay). Support for recurring charges. Automatic access… System & Network Administration, Bot Development ∙ 19 hours 24 minutes back ∙ 42 proposals |
Audit and construction of a secure infrastructure for sending BTC transactions
602 USD
We are looking for a Bitcoin security engineer for two tasks: (1) auditing the current wallet generation and BTC sending system to identify vulnerabilities; (2) designing and building a new secure infrastructure for key storage and transaction sending.Part 1 — Audit of the… System & Network Administration, Cryptocurrency & Blockchain ∙ 1 day 11 hours back ∙ 6 proposals |
Consultation on running a sole proprietorshipA detailed instruction and consultation are needed on how to properly work with FOP, Nova Poshta, Nova Pay, and timely cash register. System & Network Administration ∙ 1 day 18 hours back ∙ 2 proposals |
Eliminate the issue of incomplete data import from Excel files of Nova Poshta specifications into 1C:
45 USD
Goal: There is a processing in 1C for uploading the specifications of Nova Poshta. For unclear reasons, it has stopped loading some tabular data. We need to find the reason and eliminate the problem of incomplete data import from Excel files of Nova Poshta specifications into… System & Network Administration, Databases & SQL ∙ 4 days 14 hours back ∙ 16 proposals |
Fortinet configurationGood day! It is necessary to configure Fortinet FortiGate 40F-3G4G. Set up remote access to the PLC. Work experience. Thank you! System & Network Administration, Software & Server Configuration ∙ 5 days 18 hours back ∙ 5 proposals |