Budget: 2500 UAH Deadline: 12 days
Good day ready to get to work and do everything you can and as soon as possible if you are interested in writing in personal
Budget: 2500 UAH Deadline: 12 days
Good day ready to get to work and do everything you can and as soon as possible if you are interested in writing in personal
Budget: 12000 UAH Deadline: 10 days
Welcome to. We are ready to help you perform this work. I have experience in developing projects to perform works on different objects. thank you
Budget: 25000 UAH Deadline: 14 days
Добрий день, готовий виконати документацію ПВР на будівництво, в комплект документації ПВР ввійде текстова частина ( пояснююча записка, технологічні карти ), а також графічна частина ( креслення технологічних карт та ін.) Терміни виконання та вартість можна уточнити після ознайомлення із вихідними данними
Budget: 1000 UAH Deadline: 1 day
Нужен ПВР строительства цеха с абк согласно ДБН А.3.1-5:2016, или что то другое?.
РД и ПОБ в наличии?
Budget: 60000 UAH Deadline: 90 days
Write to me, too many questions. Moreover, starting the construction in winter is not the best option. There are a lot of factors to be taken into account. Starting from the distance from the settlement and the rose of the winds to the way from the farm to the cow to the doyline. Nutrition with concentrates is also a nuance. Usually during breastfeeding. 30 kg - I understand that the average USU, for lactation is expected to be 7-9 thousand kg.
The price is exemplary. If necessary, I can connect my colleagues.
Именно доильный цех или ферма? Какой способ содержания животных (привязный, беспривязный, боксовый), система доения («Елочка», «Карусель», «Тандем»), ожидаемая молочная продуктивность и поголовье? Молоко охлаждается? Нужны ветеринарка, пункт осеменителя? Какая раздача корма? Сроки и бюджет? И да, здание планируется строить или надо реконструировать? Системы навозоудаления и поения тоже надо учесть.
Какое количество коров и ожидаемая молочная продуктивность на фуражную корову? "Карусель" на сколько голов?
Доение двукратное или трехразовое? Блок еще не построен, фундамент не заложен? Подача воды из водонапорной башни на сколько тысяч кубометров? Электричество? Забирать будут молоковозы какого тоннажа? Танков четыре планируется?
It is necessary to design solar stations on a permanent basis - both large and small. Layout of panels, calculation of generation in PV syst, selection of main and electrical equipment (this is preferable).
It is necessary to design a cabinet with two drawers for the bathroom. White color. The drawers should have soft-close mechanisms. We will assemble it ourselves. The cabinet stands on legs.
Develop for two devices: general assembly drawing of the metal frame; general assembly drawing of the service platforms; detailed drawings of ladders; detailed drawings of railings; detailed drawings of equipment supports; specification of metal products; St3 or 09g2s As a result of the design, it is necessary to obtain: 3D model of the frame. General assembly drawing. Specification of metal products. Calculation of the load-bearing capacity of the structure (will be a plus). Description of the device:ParameterValueType of deviceVertical reactor with a stirrerWorking volume2.0 m³Total volumeabout 2.36 m³Body diameterabout 1500 mmHeight of the deviceabout 4265 mmBody materialSteel with enamel coatingType of stirrerAnchorStirrer rotation frequencyabout 85 rpmHeat carrierThermal oil
Development of a mechanism for alternating the flipping of plastic cupsProject Goal It is necessary to develop only the mechanism for flipping plastic cups "every other one" for an automatic production line. The device must ensure the following sequence: 1st cup — without flipping (0°) 2nd cup — flip 180° 3rd — without flipping 4th — flip 180° and so on. As a result, the output should produce the sequence: 0° → 180° → 0° → 180° → ...What is already available The cups move along the conveyor in a single row. Before the mechanism, all cups have the same orientation (lid up). Only the flipping unit needs to be developed.Proposed Operating Principle The following scheme is considered: A dividing screw synchronizes the flow of cups. All cups gradually rotate to the position of 90°. Then, the cam mechanism acts only on every second cup. Every second cup returns from the position of 90° back to 0°. The others continue rotating to 180°. As a result, we get: 0° 180° 0° 180° If the performer offers a simpler, more reliable, or more technological solution — we are ready to consider it.Requirements1. Develop a complete 3D model in SolidWorks It is necessary to model: dividing screw; flipping mechanism; cams; guides; shafts; mountings; all necessary parts.2. Perform kinematic verification It is necessary to ensure that: the mechanism operates without jamming; there are no intersections of parts; the cups are flipped correctly; the mechanism is suitable for manufacturing.3. Conduct Simulation / Motion Study It is necessary to perform an animation of the mechanism's operation in SolidWorks Motion. It should be visible: the movement of the cups; the rotation of parts; the sequence of flipping every second cup.Work Result The performer must provide: source files SolidWorks (*.SLDPRT, *.SLDASM); assembly; Motion Study; animation video; STEP file of the assembly; drawings of the main parts.