An official calculation of the electrical load of the architectural object (multi-apartment building) needs to be performed in accordance with the requirements of the Distribution System Code (p. 4.1.40) and the response letter from PrJSC "DTEK Kyiv Electric Networks".
Details:
• Object: multi-apartment residential building, Kyiv, Mykola Bazhan Ave, 26.
• Apartment (request for increased capacity).
• Required document: calculation of the building's load signed by the chief engineer-designer with a seal.
• The document must be suitable for submission to DTEK (official format, with a seal).
💡 Important: a performer with a valid certificate / permit for the design of electrical networks is needed.
Expected result:
• Official load calculation (paper document with a seal and signature).
• If necessary — consultation on the next steps (technical conditions, project, submission to DTEK).
Terms: preferably 1–2 weeks.
Budget: to be discussed.