Rewrite the text
Make a rewrite of the text (505 words):
At what stage of renovation should you order and install interior doors?
People who have experienced renovation strongly recommend controlling crucial moments. Even if you have completely entrusted it to a team of builders working on a "turnkey" basis. One of these moments is the installation of interior doors. It's not just about choosing the design of the door leaf. When measurements and installation were carried out, the final result is influenced no less than by the installation itself.
So, what is the main problem?
Builders and installers have radically different opinions on when to install interior doors
In most cases, finishing craftsmen insist on installing at least the door frame before the start of plastering works. Their logic is clear:
- Interior doors should be installed level. All flaws in plaster - bumps, hollows, vertical misalignments - will immediately become visible.
- The leveled frame can be used as a guide.
To preserve them, they promise to protect the front surface with film, painter's tape.
So what does the customer get in most cases? In most cases - a spoiled exterior:
- Construction mixtures can penetrate even through the film, especially near the edges. Those who have tried to wash off dried putty or primer at least once know well: it's not easy to wipe it off. Residual traces will be particularly noticeable on dark surfaces.
- If an incompetent master uses the frame as a guide, it will damage it. Do not doubt it.
- The interior door frame is made of MDF. PVC coating does not protect the entire surface. MDF is sensitive to prolonged exposure to increased humidity, which is inevitable during finishing works. The result - the frame will warp.
But most importantly: none of the above problems is a warranty case.
Builders' request to install doors before plastering works or tiling is an attempt to hide their low qualifications.
Not only installation, but also measuring openings for interior doors should be done after completing the main construction and finishing works
Manufacturers of interior doors and specialized installation teams, based on years of experience, recommend ordering interior doors:
- After finishing plastering and laying tiles - this way the wall thickness will be accurately known, and therefore, the dimensions of the openings.
- After laying the finishing floor covering - in this case, the optimal gap between the floor and the door leaf will be maintained in structures without thresholds, the threshold will not be lower than the floor level. The leaf and frame will be made to the required height immediately. It will not need to be cut.
It takes about two weeks on average to manufacture a set of interior doors. During this time, the walls in the apartment or house will be painted or wallpapered.
Installation of interior doors - the final stage of renovation
This is an operation with a minimal amount of debris and dust. Experienced masters will not harm the finishing of walls, floors, and ceilings:
- Ideally, if there are wallpapers on the walls already. Then the team will do everything necessary in one visit. Up to installing architraves.
- Neat junction zones between the floor covering and the frame will be formed - without gaps. This is especially important when laying laminate or parquet.
Installation of interior doors before wallpapering is allowed. But the architraves should still be installed afterwards.
A separate issue is stretch ceilings. They are most often installed after wallpapering the walls. The technological process involves intense heating of the room with gas heat guns. The PVC film used for finishing interior doors is not resistant to prolonged exposure to high (over 60 degrees) temperatures. Therefore, in this case, the installation of interior doors also remains last.
Special designs of interior doors
The above is completely true for swing interior doors. But when choosing non-standard designs, the sequence of operations may change. Examples include hidden or sliding doors. In this case, we recommend calling a specialist for consultation at the early stages of renovation.
Factory "Dorum": quality interior doors with perfect installation
The Kharkiv factory "Dorum" provides comprehensive services in Kyiv, Kharkiv, and Odesa:
- Our master will come to the site at a convenient time for you.
- After manufacturing the order, interior doors will be delivered and carefully brought to the installation site.
- A team of masters will perform professional installation - we guarantee accuracy and long-lasting results.
By ordering interior doors from "Dorum", you will get a wonderful final touch to your renovation. Our doors will perfectly fit into the design of your interior and will serve you for many years.
-
8042 504 3 6 Good day
I will perform quality rewriting
Contact me
Happy to help)
-
164 2 0 Hello, I will complete the task quickly and efficiently. Feel free to contact me, I will be happy to cooperate.
-
4123 67 1 I will do it quickly and qualitatively. Ukrainian language native speaker. Contact me!
-
722 17 0 I am ready to start work. For discussing details, contact me in DM.
Current freelance projects in the category Rewriting
Simple copy paste and data entry work
1200 USD
We are seeking a detail-oriented freelancer to assist with simple data entry tasks. The ideal candidate will have ex- perience with Microsoft Excel and be able to accurately input into our systemic Copywriting, Rewriting ∙ 3 hours 50 minutes back ∙ 4 proposals |
SeryozhaLooking for a literary editor / beta reader for a fiction text of about 90,000 characters with spaces. The text has already gone through several stages of refinement, and now I need help to bring it to a quality final draft. What is important: — correcting errors and stylistic… Text Editing & Proofreading, Rewriting ∙ 1 day 3 hours back ∙ 32 proposals |
Book layout for printingI am looking for someone to format a book for printing based on the submitted Word file. The book contains footnotes and illustrations in the text, as well as lists of people. Rewriting ∙ 7 days 17 hours back ∙ 13 proposals |