• Projects 4
  • Rating -
  • Rating 1 127

Budget: 1250 UAH Deadline: 1 day

Hello, Yuriy.
Do we need to transfer only the Nomenclature with Prices? And the Balances, right? Which specific BAS configuration? We have the necessary ready tools, experience, and can resolve this issue. There are a couple of clarifying questions that we can discuss in correspondence.

MCBP+ integration exchange
  • Projects -
  • Rating -
  • Rating 267

Budget: 1400 UAH Deadline: 1 day

Data transfer from 77 to 8 is a well-known and simple task. Much depends on the structure and content of the data in 77. Usually, such a transition is a good opportunity to clean up and reorganize the nomenclature directory, including using the rich data structure in 8. The volume and cost of the work depend on the amount of data. In our work, we have encountered a spare parts directory with 450,000 items + a replacement table with 300,000 and a product table with 200 items :) We are professionally engaged in BAS PP (1C) since the very first versions.

  • Projects -
  • Rating -
  • Rating 138

Budget: 4500 UAH Deadline: 5 days

Hello! Contact me, I will help you with this issue. I have been working in this field since 2011, I have completed similar tasks more than once.
Sincerely,
Yaroslav

  • Projects -
  • Rating -
  • Rating 156

Budget: 1500 UAH Deadline: 4 days

Hello
We can consider several options,
transition from standard 1C7.7 to standard BAS 8.3
Or only the necessary data (the inventory reference with items that have balances)
Or all references and documents, which is very time-consuming and costly

Contact me for details in private, we will discuss everything

Vladimir Malomuzh

Vladimir Malomuzh

Winning proposal
35 3
  • Projects 35
  • Rating 5.0
  • Rating 1 534

Budget: 2000 UAH Deadline: 3 days

Good day. I have transferred it more than once. The guides can be transferred and the initial balances can be set during the day. Transferring documents from 15 years is a thankless job. I can transfer them, but still, I will have to manually go into each one, check, and process.

  • Projects -
  • Rating -
  • Rating 636

Budget: 1300 UAH Deadline: 2 days

Hello. I can help with transferring data from 1C 7.7 to BAS/1C 8. I would start by checking the structure of the old 1C 7.7 database, the reference directories, the balances of inventory items, and the matching rules with BAS/1C 8. Then I would perform a test transfer, reconcile the balances and inventory items, so that all discrepancies are visible before the main transfer.

  • Projects -
  • Rating -
  • Rating 501

Budget: 3000 UAH Deadline: 2 days

Hello! I have experience in technical work with data structures and their migration between accounting systems. I will help you correctly transfer your database without losses.

What I will do:

Nomenclature: Full export of reference materials (items, units of measurement, characteristics).

Balances: Transfer of current balances as of a specified date to start working in BAS.

Validation: Data reconciliation after import (OSV) to confirm the accuracy of the transfer.

  • Projects 28
  • Rating 5.0
  • Rating 4 602

Budget: 1400 UAH Deadline: 1 day

Hello, ready to discuss all the details of the collaboration on the transition project, we complete tasks quickly and efficiently, for clarifications please contact me in private messages.

  • Projects 24
  • Rating 4.0
  • Rating 465

Budget: 700 UAH Deadline: 1 day

Good evening. Feel free to reach out. I have extensive experience. I would be happy to collaborate. Sincerely, Oksana.

  • Projects 70
  • Rating 5.0
  • Rating 7 057

Budget: 799 UAH Deadline: 3 days

I will complete your task turnkey.
I have experience in implementing such data transfers.
I provide a guarantee for the completed work.
The calculation of the exact cost will be after discussing all the details.

Proposals concealed

The list does not show proposals concealed by the client or freelancer with a Plus profile, as well as proposals violating rules

Current freelance projects in the category Enterprise Resource Planning (ERP)

6 July
4 July
3 July
1 July