Oleg S.

Oleg S.

Winning proposal
72 1
  • Projects 54
  • Rating 5.0
  • Rating 1 246

Budget: 800 UAH Deadline: 1 day

You have to look at it, but if the images are stored in the base, the problem is probably in them. You can either keep them in an external storage (in this case, this is a folder on the disk, so in Russian UT now do). Disadvantages - you can accidentally or deliberately easily lose images.

It can also be translated into SQL. In this case, the size of the base will not matter, it will work much faster.

Or, as an option, you can try to cross the current images, they simply occupy too much space on their own. If for this reason, you can sign that, in case of the image is added, it is checked and, if necessary, automatically pressed (or a message was issued to the user).

Well, in itself, you need to perform the "compressing tables of the database" in the configurator. This should also reduce the size a little.

If you write, we’ll see what you can do.

  • Projects -
  • Rating -
  • Rating 76

Budget: 750 UAH Deadline: 2 days

+
I propose to transfer the base to SQL. 6GB is not a size. In addition, you can also analyze the size of the "cards" and scratch/slip an abnormally large, but this is a separate conversation. In 1C 7.7 we just brought a collection of images to a separate file ball, and they didn’t shake the fast-ride account system, but now so, it seems no longer “mode”.

  • Projects 17
  • Rating -
  • Rating 613

Budget: 800 UAH Deadline: 1 day

call them. Let’s look at t. 067 410 08 67

  • Projects 107
  • Rating 5.0
  • Rating 3 621

Budget: 800 UAH Deadline: 1 day

Ready to help. The price is preliminary because the reason is unclear.
If the problem in the images is the output of the external storage, when the images are not in the base, but in the catalog on the disk
[email protected]

Proposals concealed

The list does not show proposals concealed by the client or freelancer with a Plus profile, as well as proposals violating rules

Current freelance projects in the category Enterprise Resource Planning (ERP)

4 July
3 July
1 July
1 July
30 June