Budget: 10000 UAH Deadline: 1 day
Good day . I work with leaf metal and welding structures in the SolidWorks program. Open to cooperation. We will discuss the deadline and payment.
Budget: 10000 UAH Deadline: 1 day
Good day . I work with leaf metal and welding structures in the SolidWorks program. Open to cooperation. We will discuss the deadline and payment.
Budget: 10000 UAH Deadline: 10 days
Good day . As a designer engineer, I have worked with leaf and profile metal for 16 years. Examples of work are in the portfolio. I will do everything as well and as quickly as possible.
Budget: 10000 UAH Deadline: 20 days
I am an engineer and designer for more than 4 years. I have great experience in the design of metal details/constructions, profile tube, flexible details, etc... I understand the different manufacturing technologies. I will perform your task quickly and efficiently.
Budget: 10000 UAH Deadline: 10 days
Good day .
I work with and work with Solid Works.
Experience and Qualification.
Examples of projects are in the portfolio.
Prices and deadlines are discussed by fact.
I will be happy to cooperate.
Budget: 10000 UAH Deadline: 7 days
A good day. Ready to implement your project. I have experience working with leaf metal and welding structures. I work in Solid Works. Experience in work over 11 years.
Budget: 10000 UAH Deadline: 123 days
Please, I can carry out the drawing of details under any manufacturing technology and under specific manufacturing.
Budget: 10000 UAH Deadline: 10 days
Good day !
I am interested in your project, ready for collaboration.
Experience in working as an engineer in manufacturing for 15 years.
I work in SolidWorks and Compass.
Go back, let’s discuss the details.
with respect!
by Sergey
Budget: 10000 UAH Deadline: 7 days
Good day ! I have been working on production since 2009, carrying out design and technological documentation. Ready for cooperation. Thank you in advance!
Budget: 10000 UAH Deadline: 10 days
Good Morning Eugene! Head to cooperation with you. I have experience in designing different products. I will be happy to work together, please contact us!
Budget: 10000 UAH Deadline: 5 days
Hello to you. Ready to create models and drawings to them for production according to your requirements. I am a designer engineer and specialist in SAP with experience in 3D modeling, 2D drawing and design. My sphere of competence includes solid 3D modeling of structures, 3D details, 3D collections. I also possess the skills of preparing disclosing products from leaf materials for laser/plasma/abrasive cutting, preparing models for 3D printing/processing on CPU machines, converting files into/from such formats as DWG, STEP/STP, IGES/. IGS, SLDPRT and F3D. I work with the modeling environments of AutoCAD, Fusion 360, SolidWorks, Blender. The attention to the details is the primary priority in my work. Ready for long-term/permanent cooperation.
Budget: 10000 UAH Deadline: 1 day
Good afternoon. Ready for cooperation. I have great experience in the design and manufacturing of key metal details and mechanisms. Let’s talk about the conditions.
Budget: 10000 UAH Deadline: 10 days
Ready to help you implement your project.
I work with Solidworks.
From me you will get 3D models and drawings for manufacture, in a convenient format for you.
Final cost and deadlines after the discussion.
I am pleased to cooperate
Budget: 10000 UAH Deadline: 7 days
Good day .
I will do the work quickly and efficiently.
Great practical experience.
My portfolio is https://3ddomkiev.wixsite.com/website-2/-2
HTTPS://3ddomkiev.wixsite.com/website-2
Budget: 10000 UAH Deadline: 10 days
Good day
Open to cooperation
I do according to TZ
Experience in working under the CPU
to turn)
Budget: 10000 UAH Deadline: 1 day
Ready periodically to design the details of metal for which qualifications are sufficient.
Budget: 10000 UAH Deadline: 1 day
Welcome to. There is experience working in (CAD) Compas-3D. Let’s talk about the conditions.
🙂 я чітка вакансія. Все зрозуміло. Не інженер потрібен, а виконавець. Ну звісно. Не замовник, а грошедавець, не інженер-конструктор а виконавець.
Євгене, покажіть, бодай, декілька прикладів, про що саме йдеться.
Доброго ранку! Виконаю роботу швидко та якісно. Працюю в Solidworks. Чекаю на пропозиції!
доброго дня ! можу креслити ваші моделі в solid works , розробити уп для чпу в powermill. потрібно більше деталей для оцінки роботи.
It is necessary to develop an interior design and layout of the retail equipment taking into account customer movement, merchandising rules, convenience for the seller, and placement of all product groups. The store area is 130.7 m². The premises consist of two levels. The floor plan and photographs are attached.
Output data: Existing building: single-story office building; structural scheme — frame-less brick; external walls thickness 380–640 mm; internal load-bearing walls thickness 380–510 mm; ceilings — precast reinforced concrete hollow-core slabs; foundations — columnar with FBS blocks; approximate dimensions of the building — 40.34 × 28.84 m; building area — about 747 m². Planned: dismantling of the existing rafter system and roof; addition of a second floor with glued laminated timber structures; installation of a new wooden roof structure; reconstruction of the existing building with partial changes in loads on load-bearing structures.Required to perform: Analysis of the provided technical report on the building inspection. Verification calculation of existing foundations, walls, and ceilings for the perception of additional loads from the addition. Development of structural solutions regarding: installation of reinforced belts; strengthening of brick walls; strengthening of foundations (if necessary); ensuring spatial rigidity of the building; nodes for load transfer from glued laminated timber structures to the existing building. Calculation and justification of the adopted solutions. Issuance of a set of drawings for the stages of KB/CM/KZ (depending on the adopted solutions). Consulting support during the development of wooden structures and implementation of the project.Output documentation: Scientific and technical report on the building inspection. Measurement drawings. Architectural solutions for the addition. Preliminary concept of glued laminated timber structures.Requirements for the contractor: availability of a design engineer certificate in terms of ensuring mechanical resistance and stability; experience in the reconstruction of existing buildings; experience in designing the strengthening of brick or stone buildings; preferred experience working with additions of wooden structures or glued laminated timber.Message text for Freelancehunt Good day. We are looking for a designer to participate in the project of reconstructing an existing single-story brick office building with a subsequent addition of a second floor made of glued laminated timber. It is necessary to take on the development of structural solutions regarding: reinforced belts; strengthening of existing brick walls; if necessary — strengthening of foundations; ensuring spatial rigidity of the building; load transfer from new wooden structures to the existing building. A technical inspection of the building and measurement drawings have been completed, which will be provided to the contractor after preliminary discussion of the project. Preferred experience: reconstruction of existing buildings; development of solutions for strengthening stone or brick structures; work with additions or wooden structures. Please include in your response: a brief overview of your experience; examples of similar completed projects; available certificates; estimated budget and timelines for the work. We are ready for long-term cooperation on similar projects.
We are looking for a physicist engineer or a design engineer with experience in developing induction chargers, Qi/Qi2, and working in KiCad. We already have: a ready-made wireless charging board for two devices; two coils for charging a phone and headphones; the case design and 3D models. What needs to be done Add a third charging channel for Apple Watch. Select and calculate the coil, electronic components, and connection scheme. Resolve the issue of correct Apple handshake and compatibility with Qi/Qi2. Check if the system can stably charge three devices simultaneously. Calculate the required power of the power supply, heating, and main electrical parameters. Consider the shielding of the coils, as the charger is installed inside a wooden case. Prepare or refine the schematic and PCB in KiCad. Provide recommendations on design, safety, and further certification of the device. We are considering two work formats: full development and preparation of files; engineering consultation with calculations and recommendations that our specialist can implement. Please, when responding, write: whether you have experience with wireless chargers Qi/Qi2; whether you have worked with Apple Watch or MFi components; whether you can perform calculations for coils, power, heating, and shielding; attach examples of similar projects.
Planning options for a shower module for military use based on 20 and 40-foot shipping containers. Various combinations are available. This is an AI-generated photo; it needs to be adjusted and smart dimensions for walls, partitions, and overall sizes applied for further manufacturing.
Assembly Principle: Completely weld-free, exclusively using bolted connections (“NO-WELD BOLTED CONSTRUCTION”). The structure is modular (Flat-Pack) to minimize logistics costs and facilitate self-assembly by the customer. 1. TECHNICAL REQUIREMENTS AND AESTHETICS • Requirement for the developer: The product must be designed to have a flawless, presentable commercial appearance for export to the EU market. • Intuitive assembly: The design should allow for the simplest assembly possible, enabling the customer to assemble the box independently without special tools. • Frame material: Stainless steel AISI 304 (matte), sheet thickness — 1 mm. • Construction: Corner system with flanging for rigidity and safety. Stacking (nesting) during transportation. • Wall filling (sandwich): PIR board (30 mm) with a tolerance of ±4 mm. The groove design should compensate for this tolerance, eliminating gaps. • Wall cladding: PIR board is covered on both sides with smooth stainless steel sheets of 0.5–0.6 mm. • Assembly: Strictly with bolts (stainless steel A2/A4). Minimum number of bolted connections inside the working area for ease of cleaning and disinfection. • Feet: Height 30 mm, integrated into the lower binding contour. 2. DOOR CONSTRUCTION AND LOCKING • Sealing: Rubber seal around the entire perimeter of the reveal and a stop (false bar) for 100% elimination of gaps. • Hinges: Seat design that eliminates play (bolts serve only the function of clamping). • Locking: Mechanical latch lock “finger in hole”. • Door configuration: Doors spanning the full width and height of the facade, divided horizontally into two independent sections: upper and lower. ◦ Lower section: blind. ◦ Upper section: has a viewing window. ◦ Operating principle: The lower section opens first and, when closing, tightly presses against the upper section. • Viewing window (Product No. 1): Located in the upper section. Double-sided, with an air layer. Clamping strips for securing any transparent material (glass, plastic, or film) with a thickness of from 2 to 5 mm. 3. VENTILATION SYSTEMS (Identical for both products) • Protection: Mesh (stainless steel, wire 0.5 mm, cell 0.8 mm). Installation — through clamping frames with bolts (without drilling the mesh). • Upper exhaust (120 cooler): Cutout 200x200 mm in the roof, cooler installation through a flange with M4 thread. Under the cooler (above the mesh) — adjustable damper (shutter). • Lower intake: Two openings (left and right), raised 100 mm from the floor. Area of each — 300 cm². Both intakes have adjustable dampers (shutters). 4. PRODUCT SPECIFICATION • PRODUCT No. 1 (Vertical 600x600x1200 mm): Two-section doors (lower blind, upper with window). Equipment: lamp mounts, cable pass-throughs, mounts for IR film (on the wall), curtains for mesh suspension, strip for the shield from the end. • PRODUCT No. 2 (Horizontal cabinet 600x600x600 mm): Single-section doors without glazing. Equipment: lamp mounts, cable pass-throughs, mounts for IR film (on the wall), stainless steel guides for shelves, strip for the shield from the end. 5. WHAT IS REQUIRED TO BE DELIVERED: 1. 3D assembly: STEP / SolidWorks formats, with the ability to freely disassemble the model. 2. Drawings: Detailed drawings of assembly nodes. 3. Unfoldings: DXF format (considering the K-factor of bending). 4. Specification table (BOM): All stainless steel fasteners.