Budget: 25000 UAH Deadline: 12 days

Good day.
Cost and development timelines:
Development of the KM stage (including the calculation of crane tracks for a 5t crane): ** [80,000.00] UAH | [40] working days.
Note: The declared budget of 25,000 UAH does not cover the scope of engineering calculations for a facility with an area of 1296 m² with crane (dynamic) loads. For this amount, only a sketch scheme can be executed without load collection and cross-section selection.
List of input data required to start work:
1. Approval of the final geometric scheme of the building (the attached sketches contain different span dimensions: 17/10 m versus 15.4/14.6 m).
2. Passport for the 5t crane beam (exact dimensions, crane base, maximum load per wheel).
3. Exact height mark to the rail head (level of the crane track).
4. Climate zone or exact construction address (for collecting snow and wind loads).
5. Approval of the layout scheme of horizontal wall girders (beams). The distance between them in height will be calculated based on the load-bearing capacity of the selected panel (PIR 80) for vertical installation under wind load.

Proposals concealed

The list does not show proposals concealed by the client or freelancer with a Plus profile, as well as proposals violating rules

Current freelance projects in the category Architectural Design

17 July
8 July
7 July