Budget: 27000 UAH Deadline: 30 days
Good day.
Cost and development timelines:
KM stage: complete 3D model, from which after the KMD output - 25,000.00 UAH, 15 working days.
KMD stage: 15,000 UAH, 10 working days.
List of input data required to start work:
1. Climate zone or exact construction address (for calculating snow and wind loads).
2. Finally approved cladding material (profiled sheet or sandwich panels). The difference in weight dictates the choice of cross-sections for beams and trusses; without fixing the material, the KM stage cannot be completed.
3. Availability and weight of additional technological equipment or engineering networks attached to the frame.
4. Logistical constraints regarding maximum dimensions of shipping marks.
5. Desired assortment of rolled metal considering the warehouses of your suppliers.
Examples of similar works upon correspondence.