• Projects -
  • Rating -
  • Rating 223

Budget: 10000 UAH Deadline: 10 days

The first thing I will do is calculate hardness and strength. That it did not disappear.”
Check out the outbreak:
the downward direction;
Block of rollers;
The load is 80 kg.
Transfer of loads to the wave of the reductor.
If 80 kg is the mass to raise, the dynamic coefficient should be taken into account at least 1.5. A minimum load of 120 should be accepted. (When the elevator starts, we become a bit harder.)
When you see slides and tensions, you can do a 3-D model.
If you don’t make a calculation, then you’ll publish another project because something is going to go somewhere.
Or if you exaggerate with strength - you’ll bear excessive losses because of the fact that you could have taken smaller profiles.

  • Projects 47
  • Rating 4.6
  • Rating 3 766

Budget: 16000 UAH Deadline: 28 days

Good evening . I have a great experience in modernizing non-standard equipment. ( see profile ) I will create a new model, replace the load, release a new set of drawings. Nuances of the design in the process of ordering.

  • Projects 6
  • Rating -
  • Rating 527

Budget: 10000 UAH Deadline: 14 days

The link is broken (incomplete) assembly / there is no fixation, broken links to details/.

Repeat the model for its review.
The deadlines and amounts will be specified after possible opening the collection.

  • Projects 6
  • Rating -
  • Rating 652

Budget: 10000 UAH Deadline: 12 days

Price indicated for the introduction of directions, the preparation of the CD (PDF+DXF), 4-5 render, schemes in composite/disclosed state

Proposals concealed

The list does not show proposals concealed by the client or freelancer with a Plus profile, as well as proposals violating rules

Current freelance projects in the category Drawings & Diagrams

1:13
17 July
16 July
16 July