Budget: 480000 UAH Deadline: 90 days
Good day Alena.Thank you very much for TZ, I am very pleased.In the architecture and design section, the following are required:
GP; AR; VK, OV; CR; ES, EO; NVK; NES; Design project with displays; Visualization (on the game engine - to make changes we will be up to 10 times); Sum in the complex AVK-5 (explain from the builders); PZ; Presentation video (it will be on the game engine - we can even do as a game - interactive with the possibility of interaction with objects, with VR, but this is for a separate budget);
Until February, the certificates of engineers from Ukraine were valid (you have 9 points - you need a special certification of SS3), you need to clarify whether they are valid now.If not, you need a local architectural company.But if you have a question solved (as always happens), then you don’t need certificates.Likewise, there are friends from Kazakhstan - we can accept the free, but tax expenses with you.Questions with Recommendations:
1 .Tamgals will need to be developed or there are sketches from the artist.Or just take something.I recommend the painting - it looks very cool, and not more expensive than the painting.The boys apply a layer and make cuts on it, then the LED tape is inserted - it's very cool.You can RGB with control - it will all be swallowed, you can connect to the controller - it will be under music moving and the color of any one can be chosen.2ndIs there TP in place?If not, then you need another generator with connection to the solar power plant through a special battery storage block.ThreeThe water.Is there a connection to the water pipeline or will there be a slurry.And in any case, cleaning structures and water pre-preparation will be needed - it can be too large depths of water, then radiation or with compounds of heavy metals dangerous for life.Or the sources on the surface are possible, but with a large mixture of some component, such as soda - you will have people there all chewing;
4 .Is there a recording?and 5.Are there documents on the ground?The rest is not critical or understandable.If necessary, I’m looking for examples with bathing complexes, but they’re usually in my hotel complex or a resort base.But it takes time to prepare a portfolio, and there is no time.If we sign the disclosure, I will throw you the already prepared projects into the PDF.I also see that you’ve already launched a project with a already familiar freelancer, as I understood by the amount there’s scary intentions under investors – you can connect me at this level, I’ll look at, I’ll subcorre – that’s not counted, so that then you don’t suffer in etc.to me.All questions in the face - there we exchange contacts in the telephone.