Budget: 27000 UAH Deadline: 40 days

Hello, here is a work example -- Google Drive I work with a partial advance payment of 50%. Please contact me if you are ready to discuss constructive solutions: a strip foundation is better at the depth of frost penetration - it is stronger and more economical in terms of the amount of concrete and reinforcement. For foundation design, geological surveys are needed, done once to ensure that the house does not crack or settle because a building length of 24 meters is significant, and to be confident in your own safety and the integrity of the house, you do the geology once, build, and live peacefully; the ceilings between rooms and the cold attic should be monolithic reinforced concrete. Insulating wooden ceilings is technologically complex because if the ceiling structure is improperly executed, there is a high probability of moisture accumulation in the mineral wool and biological damage to the wooden beams of the ceiling - simply put, the insulation will be wet and the wood will be affected by fungi if the builders are insufficiently qualified, cut corners, or you decide to save on materials or cannot buy sufficiently quality materials because they will not be available in the construction department in sufficient quantity; inserting engineering networks into building structures is not necessary, it is a bad idea, such structures are not repairable, if a pipe with a heat carrier cracks - breaking the foundation slab and walls to replace the pipes will not work, and you will have to make a warm floor at the expense of the room height; other project details will be discussed (27 thousand is the maximum allowed rate in the category, for $1300 and 40+ days I can do it) time, volume, and price of the design will be finalized after you send the architectural project and after agreement. Regarding possible engineering solutions from the internet - these solutions have muddied the minds of clients, and now everyone who designs houses has work - explaining why this should not be done. All authors of such videos then cease their activities, and if you look at the date of the video, it is 5-8-10 years old, and then there are no mentions of this technology, and the authors have disappeared in an unknown direction, and nothing is heard about them, why is that? Good day, get back to me.

  • Projects 3
  • Rating 5.0
  • Rating 1 048

Budget: 27000 UAH Deadline: 60 days

Good day!! Ready to discuss... Examples of work in the portfolio... Section KR $10/m2...

  • Projects 60
  • Rating 5.0
  • Rating 4 382

Budget: 27000 UAH Deadline: 30 days

Good day, Viktor.
For working on your task, there is a team consisting of an architect and a constructor.
There are examples of execution and construction of the strip foundation (with and without engineering integration). We can send samples and photos in private communication.
We strongly recommend against making any calculations or assumptions without having soil geology data.
To successfully complete the design stage for the foundation, it is necessary to at least carry out the zero cycle sewage and lay the foundation for all other engineering networks, rather than doing these sections separately at a later stage.
Also, in the survey (master plan), the actual height difference at the corners of the foundation is not entirely clear (which is critical for the strip foundation).
I suggest discussing your tasks and proposals for optimizing design solutions in private communication.

The list does not show proposals concealed by the client or freelancer with a Plus profile, as well as proposals violating rules