• Projects -
  • Rating -
  • Rating 595

Budget: 2565 PLN Deadline: 10 days

Hello, Mirek!
Thank you for such a detailed and technically sound description of the task. The project for the under-stairs cabinet with pull-out boxes 100 cm deep is an extremely interesting engineering challenge. Your logic regarding the "container" scheme is absolutely correct: at this depth and with the full weight of the modules, the side guides should work solely for stabilizing the trajectory and preventing tipping, while all the load should go onto reinforced polyurethane wheels. Otherwise, the system will simply jam.

I have extensive experience in designing custom furniture and preparing production files for CNC. The entire package you need, engineering verification, calculation of assembly gaps, selection of fittings, material specification (BOM) is my standard workflow.

I have ready examples of detailed projects with drilling maps, holes, and cutting layouts. I would be happy to send them to you for review upon request in personal messages.

Regarding the budget: A complete engineering development of such a complex cabinet requires serious time and precision, as any mistake at the factory will be costly. I am ready to implement this pilot project qualitatively and fully "turnkey" for 550 euros. This guarantees that the modules will fit perfectly into the niche, and the factory will launch the files into production without any revisions.

I look forward to hearing from you in personal messages to discuss the details!

  • Projects 5
  • Rating 5.0
  • Rating 693

Budget: 300 PLN Deadline: 5 days

Good day!

I am ready to take on your project. I have experience in developing technical documentation, 3D modeling, and preparing production drawings, so I can support the project from concept verification to a complete manufacturing package.

I can perform:

engineering verification of the design and review of proposed solutions;
selection of appropriate hardware and components;
development of assembly drawings and installation units;
preparation of material specifications (BOM);

Proposals concealed

The list does not show proposals concealed by the client or freelancer with a Plus profile, as well as proposals violating rules

Current freelance projects in the category 3D Modeling

11 July
11 July
11 July
11 July