Budget: 27000 UAH Deadline: 10 days
Hello! I can offer my help. I have examples of similar projects.
Interested in the development of a pool project.
overflow pool type, size 12x4
Interested in a project on Reinforced concrete structures and water supply technology. From our side, all technical information will be provided by the project manager. He will assist with the details.
Budget: 27000 UAH Deadline: 10 days
Hello! I can offer my help. I have examples of similar projects.
Budget: 27000 UAH Deadline: 30 days
Good day. Interesting project.
I am ready to join. You can see examples of my work in my portfolio.
It is necessary to develop a project for a frame single-story house. I will build it myself, so the drawings need to be detailed and clear.House parameters: Size 7×12 m, one floor (of which 2.8 m, terrace) Foundation — concrete piles (I will do it myself) Frame — according to modern frame construction technologiesThe main thing is practicality and economy, without unnecessary complications.
It is necessary to develop drawings for an office project consisting of three rooms and a corridor. The planning of walls and furniture has already been done; the drawings need to be completed. There is a file in ArchiCAD: *Lighting and outlet planning, *Ceiling planning, *Plan scheme for elevations and elevations (3/4 of the walls are glass), *Drawings of built-in furniture. The drawings are to be executed based on the visualization and my task.
Drawings and material list. For a canopy for the installation of solar panels. A canopy for storing equipment and vehicles. Installation site: s. Zhemchuzhnoe, Pavlohrad district, Dnipropetrovsk region, angle of about 10 degrees. Long panels 620 (230 by 113), needed in two rows about 19 meters in length available. So a frame is needed for the installation of the panels only without covering; the joints of the panels will be sealed later with rubber gaskets. It should withstand wind and snow loads. It is not standing in an open field, there are small buildings nearby, but it is outside the city and on a decent slope. A galvanized mounting profile has already been ordered, with a thickness of 1.4 mm, and it needs purlins about 1 m. So, it will probably be necessary to install a profile pipe to reinforce it, to reduce the number of beams, I think, to minimize deflection. It was planned for installation on the roof, but the roof turned out to be not quite convenient for such installation.
A working project for a wooden two-story frame with a total area of 144 sq m is required. The grid is located in a column layout of 6x6 meters. The ceiling height is 7.2 m. The purpose of the frame is for individual storage rooms. The load is 300 kg per m2.
Detailed plan for two plots for construction near the lake in Volyn region, Kovel district, village of Hlukhi. Two modular houses, utilities, solar panels, recreation areas, etc.