Project Management in Construction
Technical Assignment
Development of a project management algorithm for the production of a modular house
1. Project Goal
To develop a clear and applicable project management algorithm for the production of a modular house — from the moment of signing the contract to handing over the house to the client.
The algorithm should allow:
to plan work and deadlines
to distribute tasks
to track progress
to identify and control risks
to manage deviations in terms and budget
2. Project Description
The project involves the production and assembly of a modular house (factory production + installation on site).
The project includes:
design
procurement of materials
production of modules
logistics
installation
connection of utilities
handover of the facility
3. Main Tasks of the Contractor
The contractor needs to:
3.1. Structure the Project
Break the project into phases
For each phase:
describe the goal
input and output data
responsible parties
3.2. Create a List of Tasks
Detail tasks for each phase
Specify:
the sequence of tasks
dependencies (what depends on what)
the possibility of parallel work
3.3. Timing and Planning
Determine estimated deadlines:
by phases
by key tasks
Specify:
the critical path of the project
control points (checkpoints)
3.4. Risks
Identify key risks:
production
logistical
financial
human resources
weather
legal
For each risk:
probability
impact
preventive measures
action plan in case of occurrence
3.5. Project Control and Monitoring
Propose a control system:
project KPI
reporting (frequency, format)
deviation indicators
Action algorithm in case of:
deadline breaches
budget overruns
changes in the terms of reference by the client
3.6. Universality
The algorithm should be:
scalable
applicable to different modular house projects
understandable for a project manager without PM certification
4. Result Format (mandatory)
The contractor must provide:
Document (PDF / DOCX) with a structured description of the algorithm
Task Table (Excel / Google Sheets):
phase
task
deadline
responsible
status
Diagram / flowchart of the algorithm (Miro / Draw.io / PDF)
(Preferably) recommendations for use in:
Notion
ClickUp / Trello / Asana
5. Requirements for the Contractor
Experience in:
Project Management
construction or manufacturing projects
Understanding of specifics:
construction
modular / prefab houses (preferably)
6. Deadlines
Total deadline: 7–14 days
Intermediate result:
structure of phases — 3–5 days
7. Acceptance Criteria
The project is considered completed if:
the algorithm is logical and applicable in practice
tasks and deadlines are realistic
risks are worked out thoroughly
the document can be used as a working tool, not just theory.
Client's review of cooperation with Anastasiia D.
Project Management in ConstructionA professional in their field. Responds quickly to inquiries. I recommend.
Freelancer's review of cooperation with Andrey Malyavsky
Project Management in ConstructionIt was very pleasant to work with this client! Communication is at the highest level: the client is always in touch, quickly responds to questions, and constructively resolves any work issues. The atmosphere of collaboration is friendly and professional at the same time. I sincerely recommend this client to other performers.
Current freelance projects in the category Object Design
Architect for working with point cloudsOrder: 3D Modeling of Facade Cladding and Parapets Based on Point Cloud (BIM / CAD) I am looking for an experienced designer / 3D modeler who will create an accurate geometric model of the facade cladding and roof/parapet area based on the provided point cloud (laser… Drawings & Diagrams, Object Design ∙ 2 days 21 hours back ∙ 3 proposals |
Person to create a point cloud of the buildingLocation: Lubin Object type: Aquapark Scope of work: I am looking for an experienced company or freelancer to perform comprehensive 3D laser scanning of the building. The assignment includes: Performing ground scans outside the building. Registering and stitching scans into… Drawings & Diagrams, Object Design ∙ 2 days 21 hours back ∙ 1 proposal |
Development of KMD based on the completed projectAccording to the completed project for the separation of floors, it is necessary to develop detailed drawings in KMD for manufacturing at the factory. The project is available in PDF and DWG. Object Design, Drawings & Diagrams ∙ 4 days 1 hour back ∙ 6 proposals |
I am looking for a design engineer to develop a compact mechanism with electric drive.There is a preliminary concept for the lifting mechanism of a compact product. Since I am not a design engineer, I cannot assess how optimal the chosen scheme is. It is necessary to: evaluate the proposed concept; if it is viable — refine it; if there is a better solution —… Engineering, Object Design ∙ 5 days 16 hours back ∙ 7 proposals |
Retouching / smoothing of the 3D model (STL) and preparation of vectors for CNC millingA one-time task is needed for cleaning and optimizing graphics for further CNC milling. We have a raw "dirty" STL file (obtained through automatic image tracing) with a lot of pixel noise and irregularities. The program you work in does not matter (Blender, ZBrush, Fusion 360,… 3D Modeling, Object Design ∙ 7 days 21 hours back ∙ 9 proposals |