Object Design
312-
Electromechanical equipment is a trainer.
Object DesignFull development cycle - from the Technical task to the set of work documentation of the level of the sketch project, ready for the manufacture of the product.
-
Technical work on Prometheus
Object DesignDesign of light and dissolved suffer (prompter) to electronic video stabilizer (Steadicam) Gimbal CAME-7000
-
349 USD Decoration of the roof under the manufacture of the matrix by the CPU machine
Object DesignFrom previous 2D drawings, the 3D model of the rubber parts of the boat was developed by the surface modeling method. The parts are then scattered and collected to the cup.
The output format under the manufacture of the matrix by the CPU machine is IGES.
-
100 USD 3D model packaging box
Object DesignIn accordance with the TZ, a 3D model of packaging box with a mechanism of 3 positions is developed.
#3D #model #box #package #mechanism
-
100 USD Stend Advertising
Object DesignAccording to the picture with the sizes, a 3D model is made with the design of a set of drawings for manufacture.
#mobile #crossing #3D model
-
500 USD Roller
Object DesignDesign a child roller with the preparation of 3D files in the .stl format for the production of press-forms under a plastic leaf.
#design #3D modeling #press-form #3D printing #Visualization
-
160307 - Kitchen
Object Design#Furniture_Design #Pro100
-
100 USD The Corps
Object DesignTZ compatibility, development of 3D models, KD set (with files under CPU machines), accompaniment in manufacturing.
#3D Model #Solidworks #Technical Task #CNC #Crossing
-
by otkritka easter
Object Design
-
The VW Amarok
Object Design
-
500 USD Quest-Kimnata “Iron Man”
Object Design#Quest #Commany #Kimany #Projecting
According to the task:
_________________________________________________________
It is necessary to develop the implementation of the task with the tunnel: by opening access to the "heart" and by taking the hand of the player, it is necessary to extract the draw of the "heart" of the Iron Man and the section for its storage.
… The Task:
It is necessary to complete the processing of all the elements: 1) the tunnel in the sarcophage, 2) the locks, the closing tunnel, 3) the shimna manzetta inside the tunnel, 4) the imitation of the "heart" of the Iron Man.
_________________________________________________________
3D models of all nodes have been developed and work drawings of the level of the sketch project behind manufacturing in artificial volume.
-
113 USD Hotels in Newquay, England
Object DesignHotel in England Newquay, area 1400 m2, we carried out the projecting of the aircraft and the heating, and also carried out remote control of the work of the builders (as photo и video).