Switch to English?
Yes
Переключитись на українську?
Так
Переключиться на русскую?
Да
Przełączyć się na polską?
Tak
  • Electromechanical equipment is a trainer.

    Object Design
    Full development cycle - from the Technical task to the set of work documentation of the level of the sketch project, ready for the manufacture of the product.


  • Technical work on Prometheus

    Object Design
    Design of light and dissolved suffer (prompter) to electronic video stabilizer (Steadicam) Gimbal CAME-7000


  • 349 USD

    Decoration of the roof under the manufacture of the matrix by the CPU machine

    Object Design
    From previous 2D drawings, the 3D model of the rubber parts of the boat was developed by the surface modeling method. The parts are then scattered and collected to the cup.
    The output format under the manufacture of the matrix by the CPU machine is IGES.


  • 100 USD

    3D model packaging box

    Object Design
    In accordance with the TZ, a 3D model of packaging box with a mechanism of 3 positions is developed.
    #3D #model #box #package #mechanism


  • 100 USD

    Stend Advertising

    Object Design
    According to the picture with the sizes, a 3D model is made with the design of a set of drawings for manufacture.
    #mobile #crossing #3D model


  • 500 USD

    Roller

    Object Design
    Design a child roller with the preparation of 3D files in the .stl format for the production of press-forms under a plastic leaf.
    #design #3D modeling #press-form #3D printing #Visualization


  • 160307 - Kitchen

    Object Design
    #Furniture_Design #Pro100


  • 100 USD

    The Corps

    Object Design
    TZ compatibility, development of 3D models, KD set (with files under CPU machines), accompaniment in manufacturing.
    #3D Model #Solidworks #Technical Task #CNC #Crossing


  • by otkritka easter

    Object Design


  • The VW Amarok

    Object Design


  • 500 USD

    Quest-Kimnata “Iron Man”

    Object Design
    #Quest #Commany #Kimany #Projecting
    According to the task:
    _________________________________________________________
    It is necessary to develop the implementation of the task with the tunnel: by opening access to the "heart" and by taking the hand of the player, it is necessary to extract the draw of the "heart" of the Iron Man and the section for its storage.
    The Task:
    It is necessary to complete the processing of all the elements: 1) the tunnel in the sarcophage, 2) the locks, the closing tunnel, 3) the shimna manzetta inside the tunnel, 4) the imitation of the "heart" of the Iron Man.
    _________________________________________________________
    3D models of all nodes have been developed and work drawings of the level of the sketch project behind manufacturing in artificial volume.


  • 113 USD

    Hotels in Newquay, England

    Object Design
    Hotel in England Newquay, area 1400 m2, we carried out the projecting of the aircraft and the heating, and also carried out remote control of the work of the builders (as photo и video).