As a result, an account was created and confirmed (partially by me), and the first ad setup was done. It took a total of the first 2 weeks.
There was no management at all. Nor any initiative from the specialist.
The initiative was present until the payment was made, and it appeared again after the payment period ended.
But during the work process, it felt like I had to pull every explanation out.
I informed him about this - he said he did not understand the essence of the complaint.
It was not visible that the specialist was trying to understand the test task and the niche; noticeable time savings were evident.
I had to repeat the same thing several times, the essence of the niche we are testing, which links to the pages.
I understand that managing 11 projects simultaneously is not easy (although he might be delegating to assistants).
The hypothesis test lasted 2 weeks.
We received a couple of applications (there were no payments), which did not fit the desired cost.
The budget for the campaign was not large, $10 per day.
In my understanding, normal "management" of advertising by a direct marketer means changes in the advertising campaign initiated by him.
Hypotheses that the direct marketer initiates and comes up with to change, banner replacements, headline changes, reconfigurations - to test the result.
There were no reconfigurations of the campaign or banner replacements (there were changes when the direct marketer mistakenly put the wrong links in the ad, which was forced. And at the end, changing the links when the campaign ended, at my request).
But after a week of the campaign, at my request, "Let's try to change something, it's not working" - the response was "let's wait a bit longer, the campaign is learning."
Although the first setup did not work very well.
The specialist probably has his own view of the situation.
Perhaps the ideal option for him would be for me to come up with the headlines, banners, and structure of the campaign myself, and without wasting time, just mechanically replace everything.
Then it would have been necessary to warn about this before starting the work - but I consider this unacceptable.
As a result, it turned out that one test was conducted, but it is not what was desired.
Before this feedback, it seemed that everything was fine in our cooperation, but my feedback is unlikely to please him.