3D Modeling
3479-
by Vipp
3D Modeling#vipp #bath #render #3dsmax #vray #photoshop
-
45 USD 3D Phantom Assassin
3D Modeling
-
180 USD Tank T 21 (USA) M 1 : 1
3D ModelingThe tank T21 (USA) - M 1:1.
Modeling with sketches, drawings and photographs.
The model is highly detailed.
Modeling time + coordination = 45 days.
-
by Sketch
3D Modeling
-
113 USD The Ford T150 Raptor
3D Modeling3D modeling and visualization of Ford
-
The cup of Caesar.
3D ModelingModeling by sketch and photographs, visualization, post-working
Cinema 4D + Physical Render, Photoshop
-
180 USD SAU T-92 (USA) M 1 : 1
3D ModelingTank T-92 (SAU) - USA
Modeled by sketches and drawings + photos of individual fragments.
The model is highly detailed.
The duration of modeling is 45 days.
-
100 USD Happy New Year!
3D ModelingThe New Year - 2017
-
204 USD Type of passenger
3D ModelingModeling in SolidWorks, visualization in Keyshot.
-
90 USD Shot Blast Turbine
3D ModelingModeling in SolidWorks, visualization in Keyshot.
-
200 USD Barrel for the sign
3D ModelingPortrait of Barrelife by photo. Model under CPU for the production of the print shape of the label.
-
101 USD The Swedish Wall
3D ModelingTime of execution: ~60 hours (with additional equipment such as canat, rope trail, play, etc.)
#Maya #Keyshot